Introduction

By 2025 Suffolk aims to achieve a 65 per cent reduction in CO2 emissions. This is in addition to an immediate target of four per cent a year reduction that is already required from council operations.

In support of Suffolk County Council’s aspirations to be the greenest county in the UK, the street lighting team devised a number of initiatives to reduce energy costs and carbon emissions from its street lighting stock. Part-night lighting was identified as potentially a significant contributor to these targets.

 

The Challenge:

 

Reduce energy costs and carbon emissions

 

Following cabinet approval of part-night lighting policy the team identified a requirement for a centralised asset management system together with an intelligent lighting management system in order to implement these ambitious plans. Suffolk County Council also identified the importance of remote working in order to minimise data discrepancies and improve the efficiency of their maintenance operation.

 

Councillor Jane Storey Portfolio Holder for Resource Management states:

 

“Suffolk County Council is an innovative and forward thinking authority. Alongside the procurement of an Asset Management System was a European Procurement for a Street Lighting Central Management System. It was therefore essential that the two systems could communicate with each other so that the financial savings could be realised.”

 

The Objectives:

 

  •  To generate revenue savings through a reduction in energy usage associated with part-night lighting

  • To generate further revenue savings through the reduction in maintenance charges

  • A reduction in carbon emissions

The Solution

 

Custom built integrated Intelligent Lighting Solution (ILS)

 

An Asset Management System supplied by Causeway, together with a Central Management System by Telensa, was selected. This integrated Intelligent Lighting Solution (ILS) was designed to realise significant energy savings for the local authority and to improve maintenance of the county’s 55,000 street light assets.

 

Causeways’s Street Lighting was used on mobile devices to link newly installed telecells on street lighting columns to the centralised Causeway asset database. Six two-man teams carried out the installation programme using barcode readers to scan every individual telecell linking it to the correct asset in the Causeway database in order to minimise human errors.

 

In addition to the part-night lighting project the integrated Causeway/Telensa solution also allows for real-time fault reporting, improved maintenance, and the introduction of an out-of-hours service for emergency services allowing, if requested, areas to be relit.

"The use of state of the art software from Causeway has been crucial to the success of our part-night lighting project."

 

Richard Webster Electrical Services Manager

 

The Outcome:

 

Cost and time efficient reporting and repair processes

 

The total value for the supply of materials and installation of the ILS was estimated to be £2.8 million. The actual cost was £2.775 million and therefore the project came in at nearly £25,000 under budget.

At the onset of the project, financial savings were predicted based on the number of lights that would be subjected to partnight operation and the specific times of operations. By adjusting the ILS’s light sensors the timings were ‘trimmed’ with lights coming on a few minutes later at dusk and going off a few minutes earlier at dawn. This minor adjustment contributed to actual costs savings of £641,000 per annum compared to the estimated £550,000, a 16.5 per cent gain.

In addition to costs savings realised through reduced energy consumption the reduction in actual lighting hours equates to a reduction of 3,300 tonnes of carbon every year. This is equivalent to the emissions of nearly 700 cars.

On top the reduction in carbon emissions achieved through part-night lighting Suffolk County Council’s maintenance contractor has calculated carbon savings through maintenance efficiencies and reduced fuel consumption of around 300 tonnes per year – another 60 cars!

 

Richard Webster Electrical Services Manager said:

 

“The use of state of the art software from Causeway has been crucial to the success of our part-night lighting project. The benefits for residents of Suffolk have been tangible with significant financial savings and environmental gains having been made.”

 

Moving forward Suffolk County Council is considering a capital funded Invest-to-Save project to replace an initial 15,000 lanterns with LED units.

 

LED provides on average a 50-60 per cent reduction in energy consumption. The units also have an extended life expectancy of around 20 years compared to a 3-6 year life expectancy for traditional lamps. Until recently the cost of LED technology was thought to outweigh any savings achieved however now costs are comparable LED presents a viable alternative.

 

Presently Suffolk County Council has around 1,000 LED units already installed and initial feedback has been very positive. As dimming has been applied to these already low energy units’ power consumption has been further reduced realising savings above 63 per cent without a reduction in burning hours.

 

Are you interested in hearing how you can achieve the same results for your business? See how Causeways Street Lighting Maintenance Solutions could make an instant difference to your business by booking a 30-minute demonstration here.